Water Resources Use: Implementing water installations and constructing reservoirs
• Establishing a reservoir in Upper Bsous with a capacity of 1000 cubic meters, including the valve chamber and the filter station for Ain Rummaneh spring. And the construction of a pumping station in mid Bsous with a tank of 500 cubic meter. The installation and operation of a submersible pumping group inside a well in Bsous, and the installation of Ductile Iron Pipes for the need of the push line. And installation of Ductile Iron (FD), Polyethylene (PE) and Iron (A) Pipes in the Bsous area, with a total length of 15,000 meters.
• Implementation of water installations in the town of Beit Meri - Metn District, with the installation of Ductile Iron (FD) and polyethylene (PE) Pipes, with a total length of approximately 28,500 meters.
• Implementing water installations and construction of a 500 cubic meter reservoir and pumping station in Faraya, with Ductile Iron (FD) and polyethylene (PE) Pipes with a total length of approximately 38,000 meters
• Implementing water installations and rehabilitating a 75 cubic meter tank in Bazioun, Jbeil District, with installation of Ductile Iron (FD) and polyethylene (PE) Pipes, with a total length of approximately 3000 meters.
• Supplying the Bsalim area with drinking water from the wells of Nahr El-Mot and the construction of a 100 cubic meter tank.
• Implementing water installations in Al-Mashraa, Baskinta, Matn District, with Ductile Iron (FD) Pipes installed, with a total length of 2,300 meters.
• Implementing water installations and construction of 500 cubic meters tanks and pumping stations in the Makhada and Ehmej regions with the installation of Ductile Iron (FD) and polyethylene (PE) Pipes with a total length of approximately 9050 meters.
• Implementing water installations, purification station, pumping and reservoirs in Fatri town, Jbeil District, to secure drinking water for the town
• Implementing water installations and constructing a tank with a capacity of 500 cubic meters in the area of Madamit (Blat) - Jbeil District
• Implementing water installations and construction of 500 cubic meters tanks and pumping stations in Al Maaysra area with installation of Ductile Iron (FD) and polyethylene (PE) pipes with a total length of approximately 17650 meters